Gunite repairs Ealing tower blocks

 In Issue 11

Following a competitive tender process, Gunite (Eastern) Ltd was appointed by Ealing Council to undertake concrete, render and brick façade repairs to three 11-storey blocks of flats at Gurnell Grove in Ealing.

Each block contains 66 residential flats of mixed tenure which were occupied throughout the 12-week duration of the works. The scope of works included: cradle access; cleaning discoloured and stained brickwork; brickwork repairs and repointing; concrete repairs and coatings; render repairs; cleaning windows and frames; and temporary removal and reinstatement of satellite dishes and pigeon netting.

Gunite provided Ealing Council with a 10-year Sika warranty for the concrete repairs and coatings.

Recent Posts
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search